Documentation: Please Click, Then Make a Selection From List ** Routine Inspection and Maintenance ** (select below) -- Visual Inspection -- Grounds Maintenance -- Cleaning the Pyranometer -- Cleaning the Wetness Sensor -- Emptying the Weighing (Geonor) Precipitation Gage -- ------- Using Pump ------- Manual Method (remove cover) -- Data Retrieval using PDA -- ------- Using Palm 125 ------- Using Palm 515 ***************************************** ** Troubleshooting of USCRN Equipment ** (select below) -- Troubleshooting Satellite Transmitter -- Troubleshooting Geonor Interface Boxes -- Troubleshooting Geonor Inlet Heater ***************************************** ** USCRN Component Replacement** (select below) -- Replace Geonor Precipitation Gage Vibrating Wire -- Replace Geonor Precipitation Gage Interface Boxes -- Replace Satellite Transmitter -- Replace Data Logger -- Replace Temperature Sensor Aspirated Shields -- Replace Temperature Sensor (PRT) -- Replace Tipping Bucket (TB3) Precipitation Gage -- Replace Anemometer -- Replace Pyranometer -- Replace Surface IR Temperature Sensor -- Replace Battery Charger -- Replace Electrical Surge Suppressor